Austin High School Replacement

Project Description

Name: Austin High School Replacement
Location: Houston, TX
Completion: Spring 2020
Value: $58.7 million
Owner: Houston ISD
Architect: ERO Architects

The Austin High School Replacement project is a two-phase project that includes an extensive temporary building education complex and renovations and construction to the existing historic 1936 Stephen F. Austin High School.

Phase one was to construct a temporary building education complex. A total of 150 portable buildings were set by Webber before the Spring 2018 semester. The facility includes 90+ classrooms, all administrative offices, choir and band space, and a shop facility which includes a ship piloting simulation classroom. A modular “multipurpose” structure will also include an air-conditioned dining commons and will also be adaptable for all PE activities.

Phase two will include the demolition of the interior of the old school while keeping the historic front façade and renovating the original building. Also, it includes demolition of the rest of the campus buildings that have been added over the years and will be replaced with 184,000 square feet of new buildings. During the demolition phase, it was determined that asbestos was present in the existing structures . Webber managed the mitigation process, which had to be completed and inspected before work could continue. The new buildings will include the gyms, new classrooms, a library, band and music rooms and science labs. Classroom sizes will increase in size from the current 620-700 square feet to 850 square feet. Science labs size will double. The exterior of the building will have new hardscaping, landscaping, and outdoor learning spaces.

Phase three encompasses construction of the new campus.

Riverbend Elementary School

Project Description

Name: Riverbend Elementary School
Location: College Station, TX
Completion: April 2019
Value: $22.5 million
Owner: College Station ISD
Architect: VLK

Webber Commercial is currently constructing a new 100,000 square feet elementary school. The facility includes an administration area, kitchen, cafeteria with stage, classrooms and a gymnasium. Site work consists of new drives into the school area, parking areas, sidewalks, landscaping, irrigation and a detention pond.

Wellborn Middle School

Project Description

Name: Wellborn Middle School
Location: College Station, TX
Completion: June 2018
Value: $43.5 million
Owner: College Station ISD
Architect: VLK

Webber Commercial is currently building a two-story educational facility that includes 24 classrooms, six computer labs and six science labs. Construction also includes a life skills area, band, orchestra, drama and art halls, and competition and auxiliary gymnasiums.

Webber is also constructing athletic facilities. The scope of athletic facilities includes competition and practice football fields, a six-lane track, tennis courts, grandstand bleachers, concession stands and field house building.

Goose Creek ISD Agriscience Center

Project Description

Name: Goose Creek ISD Agriscience Center
Location: Baytown, TX
Completion: August 2018
Value: $4.5 million
Owner: Goose Creek ISD
Architect: Stantec

The Goose Creek Consolidated ISD Agriscience Center project expanded the existing facilities on a 15-acre site while allowing student use throughout the construction and renovation phases. The project created an additional 29,000 square feet of animal pens with a show arena and three new metal buildings were built for housing different species of animals. In addition, the parking lot was repaved with lighting added, site roads and detention pond were constructed and the surrounding fields were cleared.

This expanded facility supports about 350 local high school students.

New Caney ISD Early College High School

Project Description

Name: New Caney ISD Early College High School
Location: Porter, TX
Completion: January 2018
Value: $11.5 million
Owner: New Caney ISD
Architect: Stantec

The New Caney ISD Early College High school is a two story steel structure that features a brick façade and curtainwall building skin. The high school is built on 7.8-acre site and includes an outdoor basketball court and an auditorium style lecture hall.

 

Pecan Trail Intermediate School

Project Description

Name: Pecan Trail Intermediate School
Location: College Station, Texas
Completion: July 2017
Value: $28.6 million
Owner: College Station ISD
Architect: VLK Architects

The Pecan Trail Intermediate School is a two-story, steel frame structure on a pier and beam foundation with a carton form slab. There is a brick façade and a modified bituminous membrane roof.

The scope of this project includes an administration office, kitchen, cafeteria, library, classrooms, lecture halls, computer labs, restrooms, and four mechanical rooms.

Dr. Viola Garcia & Steve Mead Middle Schools

Project Description

Name: Dr. Viola Garcia and Steve Mead Middle Schools
Location: Houston, TX
Completion: June 2018
Value: $93.8 M
Owner: Aldine ISD
Architect: Morris Architects

Sister schools, the Dr. Viola Garcia Middle School and the Steve Mead Middle School, are both 227,000 square foot, two-story steel structure with a masonry brick façade. The schools are designed to educate 1,400 students in grades six through eight and includes classrooms and collaborative learning areas along with bigger hallways, sizeable outdoor learning spaces, additional large and small group learning spaces, art and music program spaces and a theater. Each school includes a cafeteria, gymnasium, science labs and playing fields on 45 acres. Each project also includes parking, roads and detention areas across the campuses. The projects will also incorporate site work parking, roads and detention areas across the spacious 45-acre campus.

Medical Oaks Pavilion III Office Building

Project Description

Name: Medical Oaks Pavilion III Office Building
Location: Austin, Texas
Completion: August 2011
Value: $6.5 million
Owner: Healthcare Facilities Development Corporation
Architect: TAG International

The Medical Oaks Pavilion Office Building is a 70,000 square feet medical facility located in Austin, Texas. The three-story building consists of precast concrete, parking, water quality features and glass curtainwall skin with an architectural steel site.

Dyna Drill Motor Center of Excellence

Project Description

Name: Dyna Drill Motor Center of Excellence
Location: Katy, TX
Architect: Kirksey Architects

Dyna-Drill Technologies, a subsidiary of Schlumberger, was conducting its operations from several leased facilities in North Houston and consolidated their offices to a new headquarters campus. Webber commercial built a 340,000 square foot, two-story tilt wall building on a 17-acre site. This project includes new office, manufacturing, material storage, and laboratory space. Webber commercial also constructed a separate commons area with full-service kitchen, dining area, fitness room, locker rooms and meeting and training spaces.

College Station High School

Project Description

Name: College Station High School
Location: College Station, TX
Completion: June 2012
Value: $91.7 million
Owner: College Station ISD
Architect: Stantec (SHW)

The College Station High School project is a 450,000 square feet school facility, with 90 classrooms and labs for 1,800 students and parking for 1,200. The scope of this project includes a centralized administration suite, clinic, library, commons, large group instruction and a 450 occupant auditorium. There are also specialized facilities such as an orchestra, band, and choir hall, dance and cheerleading practice spaces, art studios, computer and agriculture labs and shops, culinary arts cooking and food preparation stations, a life skills suite, and multiple visual areas within the main building.

Athletic facilities, including competition and practice facilities, wrestling, and weight room, are also included within the main building. Multiple outdoor athletic amenities were constructed, including a 28,000 square feet field house, football field with artificial turf and seating for approximately 4,000 people. Additionally, Webber Commercial built a connecting athletic complex including a running track, baseball and softball field, eight tennis courts, three soccer fields. Our team also incorporated press box and concession areas within the athletic plaza complex.